101 Malleable Iron Pipe Clamp Reducing Short Tee

Product Details
Customization: Available
Warranty: 30-50 Years for H.D.G
Application: Decorations
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory, Trading Company
Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
501~1000 square meters
  • 101 Malleable Iron Pipe Clamp Reducing Short Tee
  • 101 Malleable Iron Pipe Clamp Reducing Short Tee
  • 101 Malleable Iron Pipe Clamp Reducing Short Tee
  • 101 Malleable Iron Pipe Clamp Reducing Short Tee
  • 101 Malleable Iron Pipe Clamp Reducing Short Tee
  • 101 Malleable Iron Pipe Clamp Reducing Short Tee
Find Similar Products

Basic Info.

Model NO.
G101
Certification
CE, ISO
Surface Treatment
Yes
Technics
Forged
Material
Steel
Type
Pipe Clamp
Surface
Hot DIP Galvanized(HDG)
Tensile Strength
>= 350MPa
Hardness
Hb<=150
Screw Material
Stainless Steel
Elongation
>= 10%
Transport Package
Box and Pallets
Specification
G101
Trademark
HM & OEM
Origin
China
HS Code
730890
Production Capacity
50000 Sets Per Month

Product Description

101 Malleable iron pipe clamp Reducing Short Tee

PRODUCT DESCRIPTION

1. HULK Metal pipe clamp fittings are designed by using malleable iron in accordance with ASTM A197 which applies for good mechanical strength and enough elongation characters. The surface treatment of the kee clamp is hot dipped galvanized which meet the specification of ASTM A153 to anti-rusting and corrosion.
101 Malleable Iron Pipe Clamp Reducing Short Tee
2. Six different sizes are available as following.
101 Malleable Iron Pipe Clamp Reducing Short Tee

3. Three kinds of standard surface treatment can be provided on key clamp, suitable for all kinds of indoor and outdoor application.

101 Malleable Iron Pipe Clamp Reducing Short Tee

4. All our pipe joint connectors are with TUV, CE and ISO certificate.101 Malleable Iron Pipe Clamp Reducing Short Tee
PRODUCT PARAMETERS
Modular structures eliminate design and engineering costs, on-site fabrication issues while reducing installation costs.
HM pipe fittings can be adapted or extended with additional components, or to be adjusted on-site.
101 Malleable Iron Pipe Clamp Reducing Short Tee
INSTALLATION INSTRUCTIONS
Designed for easy use, our key clamps are created for the modern construction environment. It combines the benefits of strength and durability without the need of specialized tradesmen, hot work permits, fire spotters and welding protection to finished surfaces.
101 Malleable Iron Pipe Clamp Reducing Short Tee
WHO IS HULK Metal
Over 16 years, HULK Metal has been a trusted name in piping solutions by offering high-quality products, service and support to the PVF industry continuously.
We provide expertise and product solutions for a wide range of applications, plumbing, mechanical, industrial, air-conditioning and refrigeration, mining, oil, gas, fire protection, equipment and power system.
We organize the whole production process in accordance with ISO 9001 and ISO 14001. It has also the most complete certificates in the PVF industry, including UL/FM/NSF of US, CRN/cUL of Canada, DVGW/TUV/CE/VdS of Germany, BSI/LPCB of UK, SII of Israel, JIS of Japan, ABNT of Brazil, GOST-R of Russia, CNBOP of Poland, KS of South Korea, TSE of Turkey, PSB of Singapore, SIRIM of Malaysia, SABS of South Africa etc.
101 Malleable Iron Pipe Clamp Reducing Short Tee

PACKING AND SHIPPING
Cartons and then plywood pallets are used into key clamp packages, suitable for sea or air export business which can be stacked in containers.
101 Malleable Iron Pipe Clamp Reducing Short Tee
FAQ
Q1. How can I get your prices of kee clamp?
A: Please provide your detail inquiry list which including items, surface requirement and  estimated order quantity. Then detail quotation will be provided.
Q2. Can I have a sample before business start?
A: Yes, we welcome sample order to test and check our quality. Usually samples are free and you just need to pay the courier cost by FedEx or DHL.
Q3. What's about the lead time of order?
A: Sample order usually need 5-7 days after order confirmation. Mass production order usually need 30-40 days after prepayment received.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier